IT/ EN
STILCA Energy BESS storage system for industry funded by the grant
2026 Fund against De-industrialisation · Piceno Consind

Storage and photovoltaic at zero cost for your company

If you are a manufacturing company in one of the 30 municipalities of the Piceno area, the storage system (BESS) and the photovoltaic plant serving your production line are eligible for a grant of up to 100%. Not a loan, not a tax credit.

20 million reserved for the area · maximum €300,000 per company · desk open from 31 August 2026 in chronological order

100%
grant on eligible costs
€300,000
maximum contribution per company
20 M
reserved for Piceno companies
30
eligible municipalities
The grant in brief

A grant, not a loan. What it funds.

The 2026 Fund against De-industrialisation supports the investments of manufacturing companies to strengthen and upgrade their production units. Managed by Invitalia, it is granted under the de minimis regime: the contribution covers up to 100% of eligible costs, with a cap of €300,000 per company.

Storage system

The BESS is a brand-new, capitalisable plant installed to serve the production unit: it is among the eligible machinery and plant, including installation costs.

Eligible cost

Photovoltaic plant

New plant, extension or integration with storage: photovoltaic serving the production unit is among the eligible instrumental plant works.

Eligible cost

Plant & digital

Upgrading of production plant, process technological innovation, digitalisation and intangible assets (software, intangibles).

Eligible cost
What we do for you

Storage and photovoltaic. From design to maintenance.

STILCA Energy is a storage specialist, with thirty years of plants behind it. We handle both technologies in-house, without subcontracting the critical steps: you have a single point of contact for the whole project.

STILCA Energy industrial BESS storage system

BESS storage systems

Utility-scale industrial storage, from hundreds of kWh to tens of MWh, designed around how your energy system actually works.

  • Peak shaving — cut power peaks and the fixed charge on the bill
  • Time shifting — store energy when it is cheap
  • Continuity — the line does not stop when the grid fails
  • Grid services — flexibility becomes revenue
STILCA Energy industrial photovoltaic plant eligible for the grant

Photovoltaic plants

We build, extend and integrate industrial photovoltaic plants. And if you already have one, storage is what makes it truly useful: the energy you now give to the grid, you use it.

  • Design and analysis of consumption and loads
  • Workmanlike installation and assembly
  • Permitting handled by us
  • Maintenance and O&M, power electronics repair
1

Analysis

Consumption, critical loads, energy autonomy goals.

2

Design

Sizing of storage and photovoltaic, permitting.

3

Installation

Assembly and commissioning, without subcontracting the critical steps.

4

Maintenance

Operation, O&M and specialist repair over time.

First filter

Does your company qualify?

1

Manufacturing

You carry out at least one activity of macro-category C (ATECO 2025). It need not be the prevailing code. Any size.

2

Territory

You have, or are establishing, a production unit in one of the 30 municipalities under Piceno Consind.

3

Compliance

Registered in the Business Register, not in liquidation or insolvency proceedings, compliant on contributions and taxes.

4

De minimis

You have residual de minimis capacity in the three-year period, calculated at single-undertaking level.

The 30 eligible municipalities — province of Ascoli Piceno

Acquasanta Terme · Acquaviva Picena · Appignano del Tronto · Arquata del Tronto · Ascoli Piceno · Carassai · Castel di Lama · Castignano · Castorano · Colli del Tronto · Comunanza · Cossignano · Folignano · Force · Grottammare · Maltignano · Monsampolo del Tronto · Montalto delle Marche · Montedinove · Montegallo · Montemonaco · Monteprandone · Palmiano · Offida · Ripatransone · Roccafluvione · Rotella · San Benedetto del Tronto · Spinetoli · Venarotta

Timing and rules

Order of arrival counts. Here's why to move now.

Applications are submitted on a first-come basis and processed in strict chronological order of arrival. Whoever applies first is assessed first, and the 20 million run out. The project must be built and ready before the desk opens.

08.05.24 → 31.12.28
Eligibility window for costs: even an investment already started can qualify.
31 July 2026
Registration on the Invitalia platform. It gives no priority: it only serves to prepare the application.
31 Aug · 12:00
Desk opens. From here the chronological order of submission counts.
30 Oct · 12:00
Desk closes.
NextLab logo, partner for the grant application

The grant application is handled by NextLab Srl, our official partner (Ascoli Piceno · Pescara · Fermo): verification of requirements and de minimis capacity, submission of the application to Invitalia and reporting through to disbursement. You have a single point of contact; we take care of the technical side and the paperwork.

Frequently asked questions

The answers you are looking for about the grant

Yes. A BESS storage system is a brand-new, capitalisable plant installed to serve the production unit: it is among the eligible costs of the Notice (machinery and plant, including installation costs), provided it serves the self-consumption of the manufacturing site and is bought from a supplier not connected to the company.

Yes. A photovoltaic plant serving the production unit is among the eligible instrumental plant works. You can build a new one, extend an existing one or integrate it with a storage system.

Companies of any size carrying out at least one activity of macro-category C — Manufacturing Activities (ATECO 2025), with a production unit already existing or to be established in one of the 30 municipalities under Piceno Consind, duly incorporated and with residual de minimis capacity.

The contribution is a grant covering up to 100% of eligible costs, with a maximum of €300,000 per company, within the limits of de minimis capacity. It is paid as a reimbursement, with the possibility of an advance of up to 50% against a bank guarantee.

The desk is open from 12:00 on 31 August 2026 to 12:00 on 30 October 2026. Applications are processed in strict chronological order of arrival: applying early is decisive.

Costs incurred from 8 May 2024 to 31 December 2028 are eligible. An investment already started can therefore qualify, provided it meets all the conditions of the Notice.

No commitment

Free eligibility check

Tell us about your company: we analyse consumption, size the storage system and any photovoltaic, and check the grant requirements with NextLab. We tell you clearly whether you qualify and how much you can obtain.

  • Site survey and consumption analysis at no cost
  • Estimate of the contribution and of what remains at your expense
  • Check of ATECO, municipality and de minimis capacity
  • No commitment: you decide whether to proceed
0735 326879
commerciale@stilcaenergy.com · Mon–Fri 09:00–18:00

Request the check

We will get back to you within 24 working hours.
Thank you, your request has been received. We will get back to you within 24 working hours.